Operational and economical evaluation of the Forwarder in wood extraction from first cutting eucalyptus
DOI:
https://doi.org/10.5380/rf.v40i4.20323Keywords:
Custos de produção, auto-carregáveis, rendimentos operacionais.Abstract
This study aimed to technically and economically evaluate the Forwarder performance in the first cutting wood extraction from a Eucalyptus grandis plantation. Technical analysis included a movement and timing study by continuous method, and the productivity was determined using the extracted wood volume in cubic meters. Economical analysis included operational costs parameters and wood extraction cost. Results referred to the effective operational performance. Loading and unloading activities responded for more than ¾ of the total time of effective Forwarder operational cycle. Operational costs were influenced by maintenance and repair costs. The estimated cost of extraction was US$ 0.97 per cubic meter.
Downloads
Published
How to Cite
Issue
Section
License
Direitos Autorais para artigos publicados nesta revista são do autor, com direitos de primeira publicação para a revista. Em virtude da aparecerem nesta revista de acesso público, os artigos são de uso gratuito, com atribuições próprias, em aplicações educacionais e não-comerciais.A revista, seguindo a recomendações do movimento Acesso Aberto, proporciona acesso publico a todo o seu conteudo, seguindo o principio de que tornar gratuito o acesso a pesquisas gera um maior intrcambio global de conhecimento.
Conteúdos do periódico licenciados sob uma CC BY-NC-SA 4.0

