ANALYSIS OF INDICATORS AND COST OF WORLD CLASS MAINTENANCE (WCM) IN FOREST MACHINES
DOI:
https://doi.org/10.5380/rf.v49i3.60013Palavras-chave:
Maintenance management, planning, optimizationResumo
The study was carried out at a forest company located in the Paraná State, Brazil, with the feller buncher, skidder and harvester. The following indicators were evaluated: mechanical availability, mean time between failures, mean time to repair, proactive maintenance index and maintenance costs, based on data obtained over a period of 18 months, contemplating the stages of implantation, maturation and stabilization of the WCM. The results showed an increase in the mechanical availability of the cutting and skidding machines from the implantation stage. The mean time between failures increased from the implantation stage, from 31.59 hours to 37.01 hours in the stabilization stage. As for the mean time to repairs, skidder and harvester presented an increase of 25.9% and 18.9% respectively; however, this increase in time represented an improvement in the quality of maintenance services, reflected in the results of mean time between failures. There was also a 31% increase in the proactive index of the machines studied, resulting in 9% reduction in maintenance costs between the deployment and stabilization stages.
Downloads
Publicado
Como Citar
Edição
Seção
Licença
Direitos Autorais para artigos publicados nesta revista são do autor, com direitos de primeira publicação para a revista. Em virtude da aparecerem nesta revista de acesso público, os artigos são de uso gratuito, com atribuições próprias, em aplicações educacionais e não-comerciais.A revista, seguindo a recomendações do movimento Acesso Aberto, proporciona acesso publico a todo o seu conteudo, seguindo o principio de que tornar gratuito o acesso a pesquisas gera um maior intrcambio global de conhecimento.
Conteúdos do periódico licenciados sob uma Licença Creative Commons 4.0 Internacional (CC BY 4.0)